Assisi Nagar

Redevelopment Feasibility · FSI 3.5 / 4.0

01 · The site as it stands

CTS 4-A/14 · VILLAGE BORLA · 15,163.78 SQ.M · NINE BUILDINGS, PRE-1980
Scroll ↓
Land
FSI
Entitlement

Feasibility study · September 2026

Assisi Nagar redevelopment — a member-first study at FSI 3.5 and FSI 4.0

CTS No. 4-A/14, Village Borla, P L Lokhande Marg, Chembur — M Ward, residential zone. Nine buildings of flats, shops and tenements built before 1980, on land the Property Card fixes at 15,163.78 sq.m. This study is indicative, for member discussion, pending joint survey and third-party validation.

Base FSI (original) = 1→+ TDR 1.35 = 2.35→+ Fungible 0.35 = 2.7→ studied: 3.5 / 4.0

01

The land basis

Three land positions, carried through every figure in this study. The Property Card area is the floor; the 710 sq.m deduction is an optional feasibility case pending the Joint Mojini boundary outcome.

BasisArea (sq.m)Area (sq.ft)Standing
Property Card15,163.781,63,221Area as per Property Card, CTS No. 4-A/14, Village Borla. The floor: area cannot be less than this.
Card − 710 sq.moptional14,453.781,55,579Optional feasibility case: a possible 710 sq.m deduction from the original parcel (boundary settlement).
Approved sub-division20,474.322,20,384Balance area 14,624.76 sq.m plus 40% road-setback addition 5,849.56 sq.m, per approved proforma “A”.

02

Buildable potential

Total FSI-chargeable area for each case — before the road set-back TDR is counted.

FSIProperty CardCard − 710 sq.mApproved sub-division
3.55,71,275 sq.ft5,44,527 sq.ft7,71,342 sq.ft
4.06,52,886 sq.ft6,22,316 sq.ft8,81,534 sq.ft

Plus — the road set-back dividend

The 90 ft D.P. road set-back of ≈ 5,800 sq.m generates TDR at 2.5× ≈ 1,56,077 sq.ft, valued at 60% of the Ready Reckoner rate. The 0.5 FSI benefit is applied toward member compensation. Any additional TDR remains the society's property.

03

Residential : commercial

Drag to rebalance the sale component — commercial is capped at 50%. Current view: FSI 3.5 on the Property Card basis.

70 : 30max 50 : 50

Residential sale area

1,82,984 sq.ft

Commercial sale area

78,422 sq.ft

04

The entitlement ladder

On a working base of 82,000 sq.ft of existing RERA carpet across ≈168 membersto verify — 6.1 schedule. Which tier clears on which basis:

EntitlementNew carpet, totalFSI 3.5FSI 4.0
Existing + 100%1,64,000 sq.ftClears all basesClears all bases
Existing + 110%1,72,200 sq.ftClears all basesClears all bases
Existing + 115%1,76,300 sq.ftClears all basesClears all bases
Existing + 120%1,80,400 sq.ftClears all basesClears all bases
Existing + 122%headline1,82,040 sq.ftClears all basesClears all bases

05

Where the area goes

The area-based breakup the society asked for — every square foot of the current view accounted for, ready for third-party validation.

  • Member rehab (+122%)1,82,040
  • Common areas & services1,02,829
  • Club & amenities25,000
  • Sale — residential1,82,984
  • Sale — commercial78,422

Sale component = buildable − member rehab − common areas (18%) − club (25,000 sq.ft). The residual covers construction, cost of money and partner margin.

06

The revenue and cost envelope

Indicative, at named assumption rates — replaceable line by line in the annexure.

Indicative sale revenue

₹865 Cr

All-in project cost

₹761 Cr

Project surplus

₹105 Cr

Construction (built-up @ ₹4,000/sq.ft)₹308 Cr
MCGM premiums & approvals₹25 Cr
TDR @ 60% Ready Reckoner₹197 Cr
Society corpus (+122% offer)₹100 Cr
Contingency₹31 Cr
Cost of money₹99 Cr

07

One society, or two

How the additional commonly held assets serve original members best.

Single society — all membersTwin society — Assisi 1 original · Assisi 2 new
A · OwnershipAdditional common assets held by all membersAdditional common assets held by original members
B · RevenueShared by all — the original share is dilutedLeveraged only by original members — share maximised
C · MaintenanceRevenue offsets maintenance; may rise with timeAssets cover maintenance and taxes fully; income grows alongside
D · ExposureMajority decisions can burden original membersOriginal members cushioned against new-member demands

08

Assets that keep paying members

The premium club

≈ 25,000 sq.ft of club and amenities. Lifetime free membership for every original Assisi member; everyone else pays to join — a standing revenue line that funds maintenance against inflation.

Retained commercial income

A portion of the commercial area can be retained and let — in the twin-society structure this income belongs to original members and can carry maintenance and taxes in full.

The Malabar Church

The Church holds three flats — 405 + 645 + 645 sq.ft. Two fair routes: a pro-rata residential-to-commercial space flip, or a voluntary commercial allocation drawn from supporting members' own +122% entitlement. It is not appropriate to burden all for the comfort of some — contribution stays a choice.

09

Structure and delivery

SPV + lead brand partner

ARR as proposer, investor, financier and management services. Society carries no funding or project risk.

CC in 6 months

Commencement Certificate within six months of the Development Agreement.

Built in 60 months

Members take possession before any sale flat is handed over.

~₹80 Cr guarantee

Irrevocable performance bank guarantee approved by the Managing Committee.

  • Floor-to-ceiling 9.5 – 9.75 ft, every flat.
  • One uniform material specification across the project.
  • Lift lobbies designed for privacy between flat groups.

10

Open items and risk register

Joint Mojini / Kutchi Sarvodaya Nagar boundarySettlement may adjust area; the Property Card area is the floor — leaks to be found and fixed.
Public-housing reservation claimCertified copy of the 1992 DP to be obtained from MCGM; both 1992 and 2035 plans show no reservation on this plot.
Tridaathu Realty involvementTime-barred and undelivered for eight years; removal by letter citing inability to deliver.
Additional FSI from guideline changesMonetised by the investor — fair risk cover for guaranteeing fixed deliverables.
Additional TDRRemains the society's property, to use as it deems fit.

11

Assumptions and disclaimer

Every rate in this study, named — replace any of them and the whole report recomputes.

AssumptionValueStatus
Existing member carpet82,000 sq.ft · ≈168 membersTo verify — 6.1 schedule
Road set-back TDR1,56,077 sq.ftPer tender note
Ready Reckoner (circle)₹21,000/sq.ft · TDR @ 60%To verify
Residential sale rate₹31,000/sq.ftIndicative
Commercial sale rate₹38,000/sq.ftIndicative
Construction₹4,000/sq.ft · 1.35× built-upIndicative
Premiums / contingency / finance8% / 5% / 15%Indicative

This study is indicative and prepared for member discussion. All figures are subject to joint survey, the Joint Mojini report, MCGM approvals and independent third-party validation appointed by the society. Existing carpet figures must be replaced with the verified premises schedule before reliance.

Assisi Co-operative Housing Society Ltd · Chembur, Mumbai

FSI 3.5 / 4.0 · Residential–Commercial up to 50:50